SCEE completed various electrical installation and pre-commissioning works for lines 1-6  at Sino Iron Ore Project located at Cape Preston, in the Pilbara, west of Karratha WA.

Division: Construction
Sector: Mining and Metals
Client: Citic Pacific Mining (CPM)
Location:  Karratha, Western Australia
Contract Value: AU $100 Million
Timeline:  Jul 2014 – Feb 2016

These works included the electrical, control and instrument installation for the below:

  • Stockpile underground corridor
  • AG mill motor and winding connection
  • Test for the winding welding
  • Pebble crusher, ball mill and conveyors
  • Primary and secondary magnetic separator areas
  • Concentrate thickener area and flocculant plant for concentrate thickener area
  • Tailings thickener area and flocculant plant for tailings thickener area
  • Tailings pump station area
  • Process water pump station area
  • Environment water dam and pontoon pump station area
  • Raw water dam and pontoon pump station area